CONTRACTUAL GUIDELINES

REFUND & CANCELLATION POLICY

Understanding milestones, engineering deposits, and custom structural steel manufacturing cancellation terms.

Effective Date: October 2026

1. Custom Capital Manufacturing Nature

Every bomb shelter, storm bunker, and hardened steel cabin produced by Affordable Houses is a custom-engineered, build-to-order structural asset fabricated to specific soil, threat, and parcel dimensions. Because raw ASTM steel is laser-cut and welded specifically for each order, cancellation terms reflect committed manufacturing milestones.

2. Preliminary Consultation & Drafting Phase

Initial consultation and conceptual quotes are 100% complimentary. If a formal architectural engineering deposit is paid to create state-stamped CAD blueprints, that deposit covers drafting labor and is non-refundable once engineering stamps are completed.

3. Fabrication Milestone Cancellations

Once structural steel is procured and welding commences:

  • Prior to steel cutting: Deposit refunded minus incurred drafting and administrative expenses.
  • During active steel welding: Client is responsible for committed materials and labor up to the date of written notice.
  • Post-fabrication & coating: Orders cannot be cancelled as units are completed custom pressure vessels.

4. Defect & Warranty Remediations

In the rare event that a shelter does not meet contracted structural specifications, Affordable Houses will immediately repair, replace, or rectify the issue under our Lifetime Structural Warranty.